Dieses Rundschreiben ist nur in Englisch verfügbar:
Eurex Exchange will launch release 2.1 of Eurex Exchange’s T7 on 12 May 2014.
The connection test for Eurex Exchange’s T7 release 2.1 will take place on Saturday, 10 May 2014, between 4.00 p.m. and 6.00 p.m. CEST. Participation is strongly recommended for all participants and multi-member providers.
This circular outlines the most important topics for the go-live preparation that should be considered for the production launch as well as details about the connection test.
Please Note:The installation of Java Runtime Environment (JRE) 1.7 (minimum 1.7.0_b21) on the participants’ side is mandatory for T7 release 2.1. In the event that the correct JRE version is not installed, the respective Eurex T7 Trader GUI and Eurex T7 Admin GUI will not start.
Participants are requested to complete and return the production readiness statement mail reply form attached to this circular by 2 May 2014 at the latest and to register a Technical Contactfor the connection test not later than Tuesday, 6 May 2014.